BulletDraw

Solutions · Site supervisors

One screen for site supervisors.

The log, the next three weeks, the trade due Monday, the truck at the gate and who is allowed on site — for the person standing on the slab. The day's log starts pre-filled from what the job already recorded; you check it and file it.

Daily log
Pre-filled
Daily log
Logins for a trade
0
Logins for a trade
Of lookahead
Weeks
Of lookahead
Before anyone starts
Gate
Before anyone starts

Harbor Point · Lot 14 · On plan

Framing · week 9 of 31

The whole site · one screen

Daily log

Ready

Pre-filled from the day

Lookahead

1 waiting

Next three weeks

Deliveries

On site

Checked off the truck

On site

5 of 6

Cleared at the gate

Roofing agreed for TuesdayApex Roofing · from the link
Volt Electric held off siteInsurance expired · asked by link
On site

Run the site. Not the paperwork.

A log that starts from the day, a roofer's new date agreed from a link, a truss delivery checked line by line and a trade held at the gate until it clears — watch a supervisor's day.

A framer working on the top plate of a timber-framed wall
Every day, every trade

On the slab all day. Filed before you leave.

Built for supervisors

Everything a supervisor needs, in one place.

The day, the weeks ahead, the next trade, what is arriving and who is cleared — on the job you are standing on.

  1. The day, already started

    The daily log opens pre-filled from the schedule's field actuals, the day's photos and the weather, and says plainly what it could not see. To-dos go out to people who accept or decline them.

    Pre-filledSays what is missingTo-dos
  2. The weeks ahead, in columns

    A lookahead with one column per week, and every start showing what it is still waiting on — a delivery, the trade before it, or a date somebody has proposed.

    A column a weekWhat each start waits on
  3. Handoffs, answered by link

    When one trade finishes, the next is emailed a link. They accept the start, propose another date or decline — with no login — and you see every answer in one place.

    No loginAccept · propose · decline
  4. What is arriving, and what came off the truck

    Every delivery from production to on site, with the vendor's confirmed date. Check it off line by line, reject what is damaged, and take the replacement date when it is proposed.

    Vendor-confirmed datesLine by lineRejections kept
  5. Who is cleared to be on site

    The site roster shows each trade against its compliance gates. Set mobilization to block and a trade with an expired certificate is held off site until the renewal lands.

    RosterMonitor · warn · block

Built for supervisors who live on site.

Bring a real job. We will show you the log pre-filled, a handoff agreed and a delivery checked — live.

Works with any lender · Subs answer from a link